From missed deadlines and a broken MVP to a fully rebuilt.

Before and after comparison of equine tech platform MVP rescue by WireApps

Industry

Industry

Equine Management / AgriTech

Equine Management / AgriTech

Company Size

Company Size

Early-stage startup

Early-stage startup

Engagement

Engagement

Fractional CTO + DevOps as a Service

Fractional CTO + DevOps as a Service

Duration

Duration

6 months

6 months

Platform

Platform

Legacy .NET Application on IaaS

Legacy .NET Application on IaaS

Services

Services

CTO as a Service

Full-Stack Engineering

Mobile Development

DevOps

QA

Product Design

GTM Strategy

Tech Stack

Tech Stack

Claude Code (AI-assisted development)

AWS (infrastructure)

CI/CD pipelines

React Native (mobile)

Node.js (backend)

Framer (website)

The Challenge

An early-stage startup in the equine care industry had a bold vision: build a comprehensive management platform that would digitise how yards, livery operators, and racing professionals manage their day-to-day operations. The platform needed to include a mobile app for yard managers, a dedicated module for livery management, and a separate application for the racing segment of the industry. The founders engaged a developer in late 2025 who committed to delivering the MVP within two months, with a target delivery of November. However, months passed with little progress. By January 2026, after repeated delays and unmet milestones, the founder was left with a partially built mobile app, no functional backend, and a rapidly closing window to enter the market before competitors could establish themselves. The startup was at a critical juncture. They had already invested significant time and capital with nothing to show for it. Their credibility with early adopters and potential pilot partners was at risk, and the June 2026 revenue generation target seemed increasingly unachievable.

The Challenge

An early-stage startup in the equine care industry had a bold vision: build a comprehensive management platform that would digitise how yards, livery operators, and racing professionals manage their day-to-day operations. The platform needed to include a mobile app for yard managers, a dedicated module for livery management, and a separate application for the racing segment of the industry. The founders engaged a developer in late 2025 who committed to delivering the MVP within two months, with a target delivery of November. However, months passed with little progress. By January 2026, after repeated delays and unmet milestones, the founder was left with a partially built mobile app, no functional backend, and a rapidly closing window to enter the market before competitors could establish themselves. The startup was at a critical juncture. They had already invested significant time and capital with nothing to show for it. Their credibility with early adopters and potential pilot partners was at risk, and the June 2026 revenue generation target seemed increasingly unachievable.

The Challenge

An early-stage startup in the equine care industry had a bold vision: build a comprehensive management platform that would digitise how yards, livery operators, and racing professionals manage their day-to-day operations. The platform needed to include a mobile app for yard managers, a dedicated module for livery management, and a separate application for the racing segment of the industry. The founders engaged a developer in late 2025 who committed to delivering the MVP within two months, with a target delivery of November. However, months passed with little progress. By January 2026, after repeated delays and unmet milestones, the founder was left with a partially built mobile app, no functional backend, and a rapidly closing window to enter the market before competitors could establish themselves. The startup was at a critical juncture. They had already invested significant time and capital with nothing to show for it. Their credibility with early adopters and potential pilot partners was at risk, and the June 2026 revenue generation target seemed increasingly unachievable.

Partially built mobile app with no functional backend — equine startup challenge
Partially built mobile app with no functional backend — equine startup challenge
Partially built mobile app with no functional backend — equine startup challenge

The WireApps Approach

WireApps was brought in during January 2026. Our CTO immediately embedded with the founder to understand the full scope of the problem, not just the technical debt, but the business context, market timing, and what was truly needed to get the product to market.

Phase 1

Rapid Assessment & Backend Rebuild (3 Days)

Our first move was unconventional. Rather than starting from scratch, we reverse-engineered the existing mobile app codebase to understand the data models, API contracts, and business logic the original developer had been working towards. Using Claude Code, our AI-first engineering approach, we then rebuilt the entire backend in just three days.

This was not a rushed, throwaway prototype. The backend was built on solid architectural foundations with proper data modelling, API design, authentication, and error handling. Claude Code allowed our engineers to move at a velocity that would be impossible with traditional development alone.

The WireApps Approach

WireApps was brought in during January 2026. Our CTO immediately embedded with the founder to understand the full scope of the problem, not just the technical debt, but the business context, market timing, and what was truly needed to get the product to market.

Phase 1

Rapid Assessment & Backend Rebuild (3 Days)

Our first move was unconventional. Rather than starting from scratch, we reverse-engineered the existing mobile app codebase to understand the data models, API contracts, and business logic the original developer had been working towards. Using Claude Code, our AI-first engineering approach, we then rebuilt the entire backend in just three days.

This was not a rushed, throwaway prototype. The backend was built on solid architectural foundations with proper data modelling, API design, authentication, and error handling. Claude Code allowed our engineers to move at a velocity that would be impossible with traditional development alone.

The WireApps Approach

WireApps was brought in during January 2026. Our CTO immediately embedded with the founder to understand the full scope of the problem, not just the technical debt, but the business context, market timing, and what was truly needed to get the product to market.

Phase 1

Rapid Assessment & Backend Rebuild (3 Days)

Our first move was unconventional. Rather than starting from scratch, we reverse-engineered the existing mobile app codebase to understand the data models, API contracts, and business logic the original developer had been working towards. Using Claude Code, our AI-first engineering approach, we then rebuilt the entire backend in just three days.

This was not a rushed, throwaway prototype. The backend was built on solid architectural foundations with proper data modelling, API design, authentication, and error handling. Claude Code allowed our engineers to move at a velocity that would be impossible with traditional development alone.

Broken API connections and missing backend in stalled equine MVP
Broken API connections and missing backend in stalled equine MVP
Broken API connections and missing backend in stalled equine MVP

Phase 2

Gap Analysis & Strategic Roadmap

With the backend operational, we loaded the Product Requirements Document (PRD) for the Livery management module and ran a comprehensive gap analysis against the existing mobile codebase. This gave us a clear picture of exactly what was built, what was missing, and what needed reworking.

From this analysis, we created a phased delivery plan designed around one question: what does the founder need to start generating revenue by June? We structured the roadmap into three tiers:

  1. Day 1 features: The minimum feature set to begin a pilot programme with real yards. Core yard management, horse profiles, and basic livery operations.

  2. Day 7 features: Enhanced functionality to make the pilot sticky, notifications, reporting, and improved user workflows.

  3. Day 14 features: The features needed to convert pilot users into paying customers and onboard new yards.

Phase 2

Gap Analysis & Strategic Roadmap

With the backend operational, we loaded the Product Requirements Document (PRD) for the Livery management module and ran a comprehensive gap analysis against the existing mobile codebase. This gave us a clear picture of exactly what was built, what was missing, and what needed reworking.

From this analysis, we created a phased delivery plan designed around one question: what does the founder need to start generating revenue by June? We structured the roadmap into three tiers:

  1. Day 1 features: The minimum feature set to begin a pilot programme with real yards. Core yard management, horse profiles, and basic livery operations.

  2. Day 7 features: Enhanced functionality to make the pilot sticky, notifications, reporting, and improved user workflows.

  3. Day 14 features: The features needed to convert pilot users into paying customers and onboard new yards.

Phase 2

Gap Analysis & Strategic Roadmap

With the backend operational, we loaded the Product Requirements Document (PRD) for the Livery management module and ran a comprehensive gap analysis against the existing mobile codebase. This gave us a clear picture of exactly what was built, what was missing, and what needed reworking.

From this analysis, we created a phased delivery plan designed around one question: what does the founder need to start generating revenue by June? We structured the roadmap into three tiers:

  1. Day 1 features: The minimum feature set to begin a pilot programme with real yards. Core yard management, horse profiles, and basic livery operations.

  2. Day 7 features: Enhanced functionality to make the pilot sticky, notifications, reporting, and improved user workflows.

  3. Day 14 features: The features needed to convert pilot users into paying customers and onboard new yards.

Startup facing critical time pressure with closing market window
Startup facing critical time pressure with closing market window
Startup facing critical time pressure with closing market window

Phase 3

Full-Team Delivery (February – April)

We deployed a complete embedded team: a backend engineer, mobile engineer, product designer, QA engineer, scrum master, and DevOps engineer. This team operated as an extension of the startup, attending daily standups and working in tight sprint cycles.

On the infrastructure side, we set up the entire AWS environment from scratch, including production and staging environments, CI/CD pipelines for both the backend and mobile app deployments, monitoring, and automated testing. Every code push went through a proper pipeline before reaching production.

By 1 April 2026, the platform entered UAT with three pilot yards actively testing the system.

Phase 3

Full-Team Delivery (February – April)

We deployed a complete embedded team: a backend engineer, mobile engineer, product designer, QA engineer, scrum master, and DevOps engineer. This team operated as an extension of the startup, attending daily standups and working in tight sprint cycles.

On the infrastructure side, we set up the entire AWS environment from scratch, including production and staging environments, CI/CD pipelines for both the backend and mobile app deployments, monitoring, and automated testing. Every code push went through a proper pipeline before reaching production.

By 1 April 2026, the platform entered UAT with three pilot yards actively testing the system.

Phase 3

Full-Team Delivery (February – April)

We deployed a complete embedded team: a backend engineer, mobile engineer, product designer, QA engineer, scrum master, and DevOps engineer. This team operated as an extension of the startup, attending daily standups and working in tight sprint cycles.

On the infrastructure side, we set up the entire AWS environment from scratch, including production and staging environments, CI/CD pipelines for both the backend and mobile app deployments, monitoring, and automated testing. Every code push went through a proper pipeline before reaching production.

By 1 April 2026, the platform entered UAT with three pilot yards actively testing the system.

Business risk of missed milestones and credibility loss with early adopters
Business risk of missed milestones and credibility loss with early adopters
Business risk of missed milestones and credibility loss with early adopters

Beyond Product: Full Go-to-Market Support

What makes this engagement truly representative of the WireApps model is that we did not stop at product delivery. Our CTO is closely involved in product strategy, helping shape the feature roadmap based on market feedback and competitive analysis.

We are also providing comprehensive go-to-market support: SEO audit and optimisation for the client’s website, marketing automation to drive inbound leads, website redesign and content strategy, and GTM workflow automation. This is the full-stack WireApps approach, from product engineering through to revenue generation.

Beyond Product: Full Go-to-Market Support

What makes this engagement truly representative of the WireApps model is that we did not stop at product delivery. Our CTO is closely involved in product strategy, helping shape the feature roadmap based on market feedback and competitive analysis.

We are also providing comprehensive go-to-market support: SEO audit and optimisation for the client’s website, marketing automation to drive inbound leads, website redesign and content strategy, and GTM workflow automation. This is the full-stack WireApps approach, from product engineering through to revenue generation.

Beyond Product: Full Go-to-Market Support

What makes this engagement truly representative of the WireApps model is that we did not stop at product delivery. Our CTO is closely involved in product strategy, helping shape the feature roadmap based on market feedback and competitive analysis.

We are also providing comprehensive go-to-market support: SEO audit and optimisation for the client’s website, marketing automation to drive inbound leads, website redesign and content strategy, and GTM workflow automation. This is the full-stack WireApps approach, from product engineering through to revenue generation.

WireApps rapid backend rebuild phase using Claude Code AI-assisted development
WireApps rapid backend rebuild phase using Claude Code AI-assisted development
WireApps rapid backend rebuild phase using Claude Code AI-assisted development

Key Results

3 days 

3 days 

3 days 

to rebuild the entire backend using Claude Code

to rebuild the entire backend using Claude Code

to rebuild the entire backend using Claude Code

8 weeks 

8 weeks 

8 weeks 

from engagement to UAT with live pilot yards

from engagement to UAT with live pilot yards

from engagement to UAT with live pilot yards

3 yards 

3 yards 

3 yards 

actively in UAT by 1 April 2026

actively in UAT by 1 April 2026

actively in UAT by 1 April 2026

6 people 

6 people 

6 people 

embedded team (engineer, mobile, design, QA, scrum, DevOps)

embedded team (engineer, mobile, design, QA, scrum, DevOps)

embedded team (engineer, mobile, design, QA, scrum, DevOps)

June 2026 

June 2026 

June 2026 

target revenue generation date — on track despite 3-month prior delay

target revenue generation date — on track despite 3-month prior delay

target revenue generation date — on track despite 3-month prior delay

Phased delivery roadmap showing Day 1, Day 7 and Day 14 feature tiers for equine platform
Phased delivery roadmap showing Day 1, Day 7 and Day 14 feature tiers for equine platform
Phased delivery roadmap showing Day 1, Day 7 and Day 14 feature tiers for equine platform

What Our Client Say

“WireApps didn’t just rescue our product — they gave us a path to market. Having a CTO who understands both the technology and the business strategy has been transformative for us.”

 Founder, Equine Tech Startup

What Our Client Say

“WireApps didn’t just rescue our product — they gave us a path to market. Having a CTO who understands both the technology and the business strategy has been transformative for us.”

 Founder, Equine Tech Startup

What Our Client Say

“WireApps didn’t just rescue our product — they gave us a path to market. Having a CTO who understands both the technology and the business strategy has been transformative for us.”

 Founder, Equine Tech Startup

Your Next Big Product Starts Here

Work with a team that designs, builds, and ships digital products — fast, scalable, and user-first.

Mockups of WireApps’ previous digital product design and development projects

Your Next Big Product Starts Here

Work with a team that designs, builds, and ships digital products — fast, scalable, and user-first.

Your Next Big Product Starts Here

Work with a team that designs, builds, and ships digital products — fast, scalable, and user-first.

Mockups of WireApps’ previous digital product design and development projects

AI-first engineering agency for scale-ups. Fractional CTO services, dedicated engineering pods, and production AI agents.

© 2018 - 2025 Wire Apps LTD.

AI-first engineering agency for scale-ups. Fractional CTO services, dedicated engineering pods, and production AI agents.

© 2018 - 2025 Wire Apps LTD.

AI-first engineering agency for scale-ups. Fractional CTO services, dedicated engineering pods, and production AI agents.

© 2018 - 2025 Wire Apps LTD.