NEW

Augmented resourcing: senior engineers matched to your stack in 5 working days.

NEW

Augmented resourcing: senior engineers matched to your stack in 5 working days.

NEW

Augmented resourcing: senior engineers matched to your stack in 5 working days.

About us

Case studies

Insights

Contact

About us

Case studies

Insights

Contact

/

/

Franchise Management Platform

Four Senior Engineers, One Franchise Management Platform

AI-assisted delivery with humans in control

Franchise management platform: four portals (head office, franchisee, store, admin) connected to one core platform, built in about 9 weeks
Franchise management platform: four portals (head office, franchisee, store, admin) connected to one core platform, built in about 9 weeks

01

The challenge

A team of four WireApps engineers designed and built a multi-tenant, multi-brand franchise management platform, front end and backend. The core build took about 9 weeks, from 15 June to 15 August 2026. QA and stabilisation followed through to 20 October 2026.

The platform is four products in one codebase: a franchisor admin portal, a franchisee portal, a field-staff app and a customer-facing website. Each has its own login and permissions. Every franchise brand gets its own subdomain and theme, and the first brand is already live.

The engineers used Claude Code agents to write features, migrations and tests. But a senior engineer approved every plan before any code was written, and every change was reviewed before it merged. The AI handled the volume. The engineers owned the architecture, the decisions and the quality.

The client needed one platform to run an entire franchise network, built by a small team inside a fixed window.

The build itself had five hard requirements:

–

Four portals, one codebase. Franchisor admin, franchisee, field staff and the customer website each needed its own login, permissions and screens.

–

Multi-tenant and multi-brand. Each brand gets its own subdomain and theme, so adding a brand had to be a configuration change, not a rebuild.

–

Real business depth. Job sheets and scheduling, staff pay rates and compliance documents, territories, levies, Stripe Connect payments, financial reports and role-based access control.

–

Mobile first. Most users are field staff and franchisees on phones, so every screen had to work on a small screen first.

–

A moving backend. The API was being built at the same time, so the front end had to keep pace as endpoints changed.

02

The approach

Senior engineers in control, AI doing the volume

The engineers did not use AI as autocomplete. Each ran Claude Code as an agent that plans, writes and checks whole features. The engineer decided what to build, approved the plan, and signed off every change.

The rules were written down once. A shared playbook, about 480 lines on the front end with a matching set of conventions on the backend, defined the architecture, folder layout, design system, mobile-first rules and API patterns. Every agent session started by reading it, so code from all four engineers looked like it came from one team. When the team hit a surprise, such as an endpoint behaving differently from its spec, they added it to the playbook so it would not happen twice.

Tools the team built for the repetitive work

/feature-gen

Asks the engineer about a feature one question at a time, reads the Figma designs and API docs, then writes a plan for approval before any code.

Component builder agent

Builds UI components to the design system and folder rules.

Architecture advisor agent

Answers “where does this belong?” so the structure stays consistent.

/pr-review-local

Checks a branch for bugs before a human reviewer sees it.

/pr-helper

Writes pull request descriptions.

The loop every feature followed

01

An engineer picks up a ticket and runs /feature-gen.

02

The agent asks clarifying questions and drafts a plan.

03

The engineer approves or corrects the plan.

04

The agent builds the feature against the playbook.

05

The agent reviews its own branch, then a teammate reviews the pull request.

06

The change is merged.

The front end worked ahead of the backend. Mock API data let the team build and demo screens before real endpoints existed, then switch to the live API without rewriting the screens.

03

What we delivered

4 portals

4 portals

Franchisor, franchisee, field staff and customer website, on one codebase

30 modules

30 modules

Business modules across the platform

168 screens

168 screens

Built mobile first

58 endpoints

58 endpoints

New backend API endpoints

20 services

20 services

In the scheduling engine

112 tests

112 tests

Automated backend tests

All four portals run on one codebase. The front end covers 30 business modules and 168 screens in five areas:

–

Operations: job sheets, scheduling, calendar, enquiries, customers and global search.

–

People: staff profiles, pay rates, compliance documents, territories and onboarding.

–

Money: Stripe Connect for the franchisor and each franchisee, levies and transaction reports.

–

Control: roles and permissions, organisation settings, activity logs and configurable option lists.

–

Brand: multi-tenant theming, so a new franchise brand is a configuration change rather than a rebuild.

The scheduling engine

Underneath, the backend engineer built a complete appointments and job-scheduling capability from a standing start:

Appointment types and booking intake

Define and offer bookable appointment types across the admin, franchisee and website portals.

Job sheets

On-site quoting, room-by-room scope capture, versioning and customer sign-off.

Scheduling engine

A 20-service domain layer that generates recurring jobs, resolves overrides and conflicts, and tracks draft versus confirmed schedules.

Staff availability and exceptions

Working patterns, time-off exceptions and automatic conflict checks before a job is scheduled or moved.

Calendars

Per-staff and global calendar views built from the scheduling engine.

Payments and recurring billing

Agreed-amount capture on job sheets, a recurring billing-day calculator and a combined reschedule-and-payment API.

Customer-facing APIs

Website endpoints for customers to view upcoming and past appointments.

Email notifications

Transactional templates for appointment confirmations, job-sheet PDFs and agreed-amount confirmations.

04

How we kept quality high

The AI made the team faster. The engineers made sure that speed did not cost quality, by staying in charge of every decision that mattered.

–

A human approved the plan first. The agent could not start coding a feature until an engineer signed off on its plan.

–

Two reviews on every change. The agent reviewed its own branch, then a teammate reviewed the pull request. Nothing reached the main branch without a person approving it.

–

Security stayed server-side. Permission checks run on the server for every portal, not only in what the user sees.

–

Data was checked at every boundary. Every API response is validated against a schema before a screen uses it, so backend changes show up as clear errors rather than silent bugs.

–

Backend changes were tested and reversible. 112 automated tests cover the scheduling services and job-sheet endpoints, and every database migration can be rolled back.

05

What we learned

AI multiplied what each engineer could deliver, but only because the team gave it clear rules and checked its work. Here is what we now do as standard.

1

Invest in context, not clever prompts

The biggest gains came from the written playbook and custom tools, not one-off instructions.

2

Check specs against the live system early

Where API docs were wrong or incomplete, the AI built confidently to the wrong shape. Checking against the real backend early saved rework.

3

Treat mock data as a stand-in, not proof

One screen passed on mock data, then failed against the real API because the endpoint did not exist yet. A feature now counts as done only once it works against the live API.

4

Expect engineers’ roles to shift

The engineers spent less time typing code and more on requirements, design review, edge cases and testing with users. That is where senior judgement matters most.

5

Bring automated tests into the front end

The backend wrote 112 automated tests alongside the code. The front end relied on code review and manual QA, and adding AI-written tests to the front-end loop is our next step.

What this means for your team: if you need more engineering capacity, you do not need a large team or months of hiring. A small group of senior engineers, working inside a disciplined process, can take on substantial scope while you keep control of the architecture and the decisions. Talk to us about extending your team →

06

For technical readers

All figures come from the repositories’ git history, not estimates. The project ran on WireApps’ standard production codebase and review process.

AREA

METRIC

COUNT

Front end

Business modules

30

Front end

Screens

168

Front end

API endpoints wired

156

Front end

Pull requests merged

230

Front end

Commits

1,010

Backend

New API endpoints

58

Backend

Scheduling services

20

Backend

Database migrations (live)

30

Backend

Automated tests

112

Backend

Reviewed pull requests merged

About 40

After the core build ended on 15 August, the work shifted to QA and stabilisation. Most of the 132 front-end fix pull requests landed between August and October, the normal pattern for a project moving to launch.

What the backend codebase shows

Automated test coverage

112 unit and feature tests across the 20 scheduling services and the job-sheet endpoints.

Pull request review

About 40 feature and fix pull requests, each scoped to a single change and reviewed before merging.

Input validation at the boundary

14 Form Request classes validate every new endpoint before it reaches a service.

Type-safe data transfer

Dedicated DTOs and enums instead of untyped arrays moving between layers.

Reversible changes

All 30 live migrations ship with working down-migrations, including a backfill migration when payment fields moved.

Schema correction, not accumulation

Superseded tables were migrated away rather than left as dead weight once the design settled.

AT A GLANCE

CLIENT

Franchise management software (name withheld under NDA)

TEAM

4 WireApps engineers: 3 front end, 1 backend

TIMELINE

Core build in about 9 weeks (15 June to 15 August 2026), then QA and stabilisation to 20 October 2026

DELIVERED

4 portals, 30 business modules, 168 screens, 58 new API endpoints, a 20-service scheduling engine

QUALITY CONTROLS

Plan approval before code, two reviews on every change, 112 automated backend tests

SCOPE

Multi-tenant, multi-brand platform

Job sheets and scheduling

Stripe Connect payments

Role-based access control

DELIVERY

AI-assisted engineering (Claude Code)

Plan approval before code

Two-stage code review

Your next big product starts here

Work with a team that designs, builds, and ships digital products: fast, scalable, and user-first.

Your next big product starts here

Work with a team that designs, builds, and ships digital products: fast, scalable, and user-first.

Your next big product starts here

Work with a team that designs, builds, and ships digital products: fast, scalable, and user-first.

Senior engineering capacity for seed and Series A teams in the UK and US.

Offices

London, UK

Colombo, Sri Lanka

Dubai, UAE

© 2018-2026 Wire Apps Ltd.

Terms · Privacy · LinkedIn

Senior engineering capacity for seed and Series A teams in the UK and US.

Offices

London, UK

Colombo, Sri Lanka

Dubai, UAE

© 2018-2026 Wire Apps Ltd.

Terms · Privacy · LinkedIn

Senior engineering capacity for seed and Series A teams in the UK and US.

Offices

London, UK

Colombo, Sri Lanka

Dubai, UAE

© 2018-2026 Wire Apps Ltd.

Terms · Privacy · LinkedIn