NEW

Augmented resourcing: senior engineers matched to your stack in 5 working days.

NEW

Augmented resourcing: senior engineers matched to your stack in 5 working days.

NEW

Augmented resourcing: senior engineers matched to your stack in 5 working days.

About us

Case studies

Insights

Contact

About us

Case studies

Insights

Contact

/

/

Post-Cyber Attack Recovery

Post-Cyber Attack Recovery

Migrating 200+ Customers from Legacy Infrastructure to Azure

200+ customers migrated from legacy OVH hosting to Azure with zero data loss, shown as a grid of migrated customers
200+ customers migrated from legacy OVH hosting to Azure with zero data loss, shown as a grid of migrated customers

01

The challenge

A construction technology company called us in after suffering a cyber attack. They had been operating for 10 years without any C-level technology leadership. The attack exposed what years of technical neglect had created.

The infrastructure was on OVH, a European cloud provider, with no standardisation whatsoever. VMs were built manually through a dashboard. Networks, disks, and configurations were all ad-hoc. There was no Infrastructure as Code, no automation, no proper backup regime, and critically, no documentation of how anything actually worked.

The product itself was a 10-year-old .NET application. It was stateful, not cloud-native, and could only run on Infrastructure as a Service (IaaS). Platform as a Service options were not viable given the application architecture. They had over 200 customers depending on this system daily.

The mandate was clear: recover from the attack, modernise the infrastructure, and build resilience so this could never happen again.

02

The approach

PHASE 01

Assessment and standardisation

Before touching anything, we mapped the entire estate. We documented every service, understood how the application worked, and identified all the weak points in both the product and infrastructure.

WireApps brought in a DevOps consultant alongside the Fractional CTO engagement. The first priority was standardisation through Infrastructure as Code. We needed to stop the bleeding of manual, undocumented changes before we could think about migration.

We created multiple playbooks:

–

Migration procedures from OVH to Azure

–

Backup regime documentation (disk backups, database backups, retention policies)

–

Disaster recovery procedures

–

Incident response protocols

PHASE 02

Migration strategy and execution

We shortlisted Azure as the target platform. The decision was pragmatic: the application required IaaS, Azure had strong .NET support, and the security and compliance posture met their needs post-attack.

Our approach was methodical:

–

Trial and error on non-production: we ran multiple test migrations on QA and dev servers to understand the full process

–

Manual to playbook: we converted successful manual migrations into documented playbooks

–

Playbook to automation: we then converted playbooks into automated tooling

This progression, manual then documented then automated, is critical for legacy migrations. You cannot automate what you do not understand.

HONEST POST-MORTEM

Where we got it wrong, and what we learned

MISTAKE 1

Premature cloud-native architecture

We initially tried to follow cloud best practices by separating the database (Azure SQL managed service) from the application server. The first five customer migrations were disasters.

The application was not cloud-optimised. When the database was separated from the application, performance collapsed. To compensate, we had to increase IOPS on both the VM and managed SQL, which became prohibitively expensive.

The pivot: we went back to the drawing board and replicated the original architecture, with SQL Server and application on the same VM. Yes, this creates a single point of failure. But we mitigated it properly:

–

Separated data disks from application disks from OS disks

–

Implemented managed disks with proper backup

–

Set up correct maintenance windows and automation

Sometimes the pragmatic answer is not the textbook answer. A stable, well-managed "imperfect" architecture beats an unstable "best practice" one.

MISTAKE 2

Unbalanced VM distribution

With 200+ customers to migrate, we had three target VMs. In our rush to complete the migration (we were paying for two cloud providers simultaneously), we migrated over 100 customers to the first VM before properly distributing across all three.

Result: one oversaturated VM, two underutilised ones. We had to rebalance post-migration, which added complexity and risk. The lesson: migration speed matters, but capacity planning matters more. We should have enforced distribution rules from day one.

PHASE 3

Premature cloud-native architecture

With migrations complete, we focused on long-term stability:

–

Automated backup verification

–

Maintenance programme automation

–

Monitoring and alerting

–

Updated runbooks for the operations team

03

The results

200+

200+

Customers migrated from OVH to Azure

Zero

Customer data loss during migration

Infrastructure as Code

Implemented across the entire estate

Documented playbooks

For all operational procedures

Automated backups

With verified recovery procedures

Less overhead

Reduced operational overhead through automation

04

Key lessons

4.1

Document before you automate

The playbook phase is not optional. You cannot automate a process you do not fully understand, and you do not fully understand it until you have documented it step by step.

4.2

Legacy applications break cloud best practices

A 10-year-old .NET application will not behave like a cloud-native microservice. Design your infrastructure around what the application actually needs, not what the architecture diagrams say it should need.

4.3

Honest post-mortems build trust

We made mistakes during this engagement. We documented them, shared them with the client, and adjusted. This transparency built more trust than pretending everything went perfectly.

4.4

Speed vs stability is a real trade-off

Paying for two cloud providers created pressure to migrate fast. That pressure led to the VM distribution mistake. In hindsight, a more measured pace would have avoided the rebalancing work.

4.5

Post-incident is the right time for transformation

The cyber attack created executive attention and budget for infrastructure investment. We used that window to implement changes that would have been deprioritised during normal operations.

06

Client context

A construction technology company serving 200+ B2B customers with a legacy on-premises application. The engagement began in crisis mode following a cyber attack, then evolved into a comprehensive infrastructure modernisation programme. The DevOps as a Service model provided the specialised expertise they lacked in-house without requiring permanent hires in a domain that was not their core competency.

Suitable for: CTOs inheriting legacy infrastructure, companies recovering from security incidents, leaders evaluating managed DevOps services for infrastructure modernisation.

AT A GLANCE

INDUSTRY

Construction Tech (B2B SaaS)

COMPANY SIZE

200+ customers, 10-year-old product

ENGAGEMENT

Fractional CTO + DevOps as a Service

DURATION

12-18 months

PLATFORM

Legacy .NET application on IaaS

SERVICES

Infrastructure Assessment & Documentation

Cloud Migration (OVH to Azure)

Fractional CTO

Disaster Recovery Planning

STACK

Disaster Recovery Planning

SQL Server on Azure VMs

Azure Managed Disks

Azure Backup Services

Your next big product starts here

Work with a team that designs, builds, and ships digital products: fast, scalable, and user-first.

Your next big product starts here

Work with a team that designs, builds, and ships digital products: fast, scalable, and user-first.

Your next big product starts here

Work with a team that designs, builds, and ships digital products: fast, scalable, and user-first.

Senior engineering capacity for seed and Series A teams in the UK and US.

Offices

London, UK

Colombo, Sri Lanka

Dubai, UAE

© 2018-2026 Wire Apps Ltd.

Terms · Privacy · LinkedIn

Senior engineering capacity for seed and Series A teams in the UK and US.

Offices

London, UK

Colombo, Sri Lanka

Dubai, UAE

© 2018-2026 Wire Apps Ltd.

Terms · Privacy · LinkedIn

Senior engineering capacity for seed and Series A teams in the UK and US.

Offices

London, UK

Colombo, Sri Lanka

Dubai, UAE

© 2018-2026 Wire Apps Ltd.

Terms · Privacy · LinkedIn